{"id":6,"date":"2016-04-08T19:31:31","date_gmt":"2016-04-08T19:31:31","guid":{"rendered":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/?page_id=6"},"modified":"2022-08-31T12:58:31","modified_gmt":"2022-08-31T12:58:31","slug":"teaching","status":"publish","type":"page","link":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/teaching\/","title":{"rendered":"Publications"},"content":{"rendered":"<p><strong>REFEREED PAPERS<\/strong><\/p>\n<p><strong>A64.<\/strong> Gunduz, M., Abumoza, A.M., Aly, A. Aly \u201cA Structural Equation Model to Assess the Effects of Strategic and Project Related Potential Risks on Project Delivery in Qatar&#8221;, accepted to ECAM, June \u00a02022<\/p>\n<p><strong>A63<\/strong> Naji, K., Gunduz, M., Naser, A.F. \u201cConstruction Change Order Management Project Support System Utilizing Delphi Method&#8221;, accepted to Journal of Civil Engineering and Management, May 2022<\/p>\n<p><strong>A62.<\/strong> Naji, K., Gunduz, M., Hamaidi, M.F. \u201cMajor Factors Affecting Construction Waste Management in Infrastructure Projects Using Structural Equation Model&#8221;, accepted to ASCE-JCEM, May 2022<\/p>\n<p><strong>A61.<\/strong> Naji, K., Gunduz, M., Naser, A.F. \u201cThe Effect of Change Order Management Factors on Construction Project Success: A Structural Equation Modeling Approach&#8221;, accepted to ASCE-JCEM, April 2022<\/p>\n<p><strong>A60<\/strong> Naji, K., Gunduz, M., Falamarzi, M.H. \u201cAssessment of Construction Project Contractor Selection Factors Considering Their Interconnections&#8221;, accepted to KSCE, March 2022<\/p>\n<p><strong>A59<\/strong> Gunduz, M., Al-Ajji, I.S. \u201cEmployment Of CHAID And CRT Decision Tree Algorithms To Develop Bid\/No Bid Decision Making Models for Contractors&#8221;, accepted to ECAM, July 2021<\/p>\n<p><strong>A58<\/strong> Sirin, O., Gunduz, M., Shamiyeh, M.E. \u201cAssessment of Pavement Performance Management Indicators through Analytic Network Process (ANP) &#8220;, accepted to IEEE Transactions on Engineering Management, November 2019<\/p>\n<p><strong>A57<\/strong> Gunduz, M., Al-Naimi, N. \u201cConstruction Projects Delay Mitigation Using Integrated Balanced Scorecard And Quality Function Deployment&#8221;, Engineering, Construction and Architectural Management, 29 (5), June 2022, pp. 2073-2105<\/p>\n<p><strong>A56<\/strong> Gunduz, M., Aly, A. Aly, El Mekkawy, T. \u201cValue Engineering Factors with an Impact on Design Management Performance of Construction Projects&#8221;, ASCE-JME, Volume 38, Issue 3, May 2022<\/p>\n<p><strong>55<\/strong> Soliman, K., Naji, K., Gunduz, M., Tokdemir, O. B., Faisal, F., Zayed, T. \u201cBIM-based Facility Management Models for Existing Buildings &#8220;, Journal of Engineering Research, Volume 10, Issue 1A, pages 21-37, March 2022<\/p>\n<p><strong>A54.<\/strong> Naji, K., Gunduz, M., Naser, A.F. \u201cAn Adaptive Neuro-Fuzzy Inference System For The Assessment Of Change Order Management Performance In Construction&#8221;, ASCE-JME, Volume 38, Issue 2, March 2022<\/p>\n<p><strong>A53.<\/strong> Maki, O, Alshaikhli, M , Gunduz, M., Naji, K., Abdulwahed, M. \u201cDevelopment of Digitalization Roadmap for Healthcare Facility Information Management&#8221;, IEEE-Access, volume 10, pp. 14450-14462, January 2022<\/p>\n<p><strong>A52<\/strong> Sirin, O., Gunduz, M., Shamiyeh, M.E. \u201cApplication of Analytic Hierarchy Process (AHP) for Sustainable Pavement Performance Management in Qatar&#8221;, Engineering, Construction and Architectural Management, 28 (10), November 2021, pp. 3106-3122<\/p>\n<p><strong>A51<\/strong> Naji, K., Gunduz, M., Salat, F. \u201cAssessment of Pre-Construction Factors in Sustainable Project Management Performance &#8220;, Engineering, Construction and Architectural Management, 28 (10), November 2021, pp. 3060-3077<\/p>\n<p><strong>A50<\/strong> Gunduz, M., Elsherbeny, H.A. \u201cCritical Assessment of Contract Administration Using Multidimensional Fuzzy Logic Approach&#8221;, ASCE-JCEM, Journal of Construction Engineering and Management, Volume 147, Issue 2, art. 04020162, February 2021<\/p>\n<p><strong>A49<\/strong> Gunduz, M., Lutfi, H.M.A. \u201cGO\/NO-GO Decision Model For Owners Using Exhaustive CHAID And QUEST Decision Tree Algorithms&#8221;, Sustainability, January \u00a02021, 13(2), 815<\/p>\n<p><strong>\u00a0<\/strong><strong>A48<\/strong> Al-Salahi, K., Naji, K., Gunduz, M., \u201cEvaluation of the Critical Success Factors (CSFs) in Selecting Building Contractors Using Pareto Analysis and the Analytical Hierarchy Process&#8221;, Journal of Engineering Research, 8(4), pages 1-15, December 2020<\/p>\n<p><strong>\u00a0<\/strong><strong>A47<\/strong> Gunduz, M., Tehemar, S.R. \u201cAssessment of Delay Factors in Construction of Sport Facilities Through Multi Criteria Decision Making&#8221;, Production Planning &amp; Control, Volume 31, Issue 15, pp. Pages 1291-1302, November-December 2020<\/p>\n<p><strong>\u00a0<\/strong><strong>A46<\/strong> Gunduz, M., Abu-Hijleh, A. \u201cAssessment of Human Productivity Drivers for Construction Labor through Importance Rating and Risk Mapping. Sustainability, October 2020, 12(20), 8614.<\/p>\n<p><strong>\u00a0<\/strong><strong>A45<\/strong> Gunduz, M., Abdi, E.A. \u201cMotivational Factors and Challenges of Cooperative Partnerships between Contractors in the Construction Industry&#8221;, ASCE-JME, Volume 36, Issue 4, July 2020, art. 04020018<\/p>\n<p><strong>A44<\/strong> Gunduz, M., Elsherbeny, H.A. \u201cCritical Assessment of Construction Contract Administration Using Fuzzy Structural Equation Modeling&#8221;, Engineering, Construction and Architectural Management, 27 (6), June 2020, pp. 1233-1255<\/p>\n<p><strong>A43<\/strong> Gunduz M., and Al-Ruwaili, A, \u201cTendering Process Improvement with Prototype Designs Implementation\u201d, Advances In Natural And Applied Sciences, 14(2), May-August 2020, \u00a0pp. 33-38<\/p>\n<p><strong>A42<\/strong> Gunduz, M., Sirin, O., Moussa, A. \u201cApplication of Tools of Quality Function Deployment and Modified Balanced Score Card for Optimal Allocation of Pavement Management Resources &#8220;, IEEE Access, 8, art. no. 9072370, pp. 76399-76410, April 2020<\/p>\n<p><strong>A41<\/strong> K. K. Naji, M. M. Mansour and M. Gunduz, &#8220;Methods for Modeling and Evaluating Construction Disputes: A Critical Review&#8221;, IEEE Access, volume 8, issue 1, pp. 45641-45652, March 2020<\/p>\n<p><strong>A40<\/strong> Gunduz, M., Almuajebh, M.S. \u201cCritical Success Factors for Sustainable Construction Project Management&#8221;, Sustainability, March 2020, 12(5), 1990<\/p>\n<p><strong>A39<\/strong> Gunduz, M., Elsherbeny, H.A. \u201cOperational Framework for Managing Construction Contract Administration- Practitioners\u2019 Perspective through Modified Delphi Method&#8221;, ASCE Journal of Construction Engineering and Management, Volume 146, Issue 3, March 2020, art. 04019110<\/p>\n<p><strong>A38<\/strong> Gunduz, M., Khader B.K., \u201cConstruction Project Safety Performance Management Using Analytical Network Process (ANP) As A Multi Criteria Decision Making (MCDM) Tool&#8221;, Computational Intelligence and Neuroscience, February 2020, art. 2610306<\/p>\n<p><strong>A37<\/strong> Gunduz, M., Mohammad, K.O. \u201cAssessment of Change Order Impact Factors on Construction Project Performance Using Analytic Hierarchy Process (AHP)&#8221;, Technological and Economic Development of Economy, Volume 26, Issue 1, January 2020, pages 71-85<\/p>\n<p><strong>A36<\/strong> Gunduz, M., Elsherbeny, H.A. \u201cConstruction Contract Administration Performance Assessment Tool by Using a Fuzzy Structural Equation Model &#8220;, Sustainability, January 2020, 12(2), 523<\/p>\n<p><strong>\u00a0<\/strong><strong>A35<\/strong> Gunduz, M., Alfar, M., \u201cIntegration of Innovation through Analytical Hierarchy Process (AHP) in Project Management and Planning&#8221; ,Technological and Economic Development of Economy, Volume 25, Issue 2, February 2019, pages 258-276<\/p>\n<p><strong>A34<\/strong> Gunduz, M., Khan O., \u201cEffective Framework for Change Order Management Using Analytical Hierarchy Process (AHP)&#8221;, Gazi University Journal of Science, Volume 31, Issue 4, December 2018, pages 1079-1091<\/p>\n<p><strong>A33<\/strong> Gunduz, M., Maki, O.L., \u201cAssessing the Risk Perception of Cost Overrun Through Importance Rating in Construction Industry&#8221;, Technological and Economic Development of Economy, Volume 24, Issue 5, September 2018, pages 1829-1844<\/p>\n<p><strong>A32. <\/strong>Gunduz M., and Yetisir, T., \u201cA Design Reuse Technology to Increase Productivity Through Automated Corporate Memory System &#8220;, Neural Computing and Applications, Volume 29, Issue 9, May 2018, pages 609-617<\/p>\n<p><strong>A31<\/strong> Gunduz, M. and Ahsan, B., \u201cConstruction Safety Factors Assessment through Frequency Adjusted Importance Index\u201d, International Journal of Industrial Ergonomics, Volume 64, March 2018, pages 155-162<\/p>\n<p><strong>A30<\/strong> Gunduz, M. and Laitinen, H. \u201cObservation based safety performance indexing method for construction industry \u2013 Validation with Turkish SMEs\u201d, KSCE, Volume 22, Issue 2, February 2018, pages 440-446<\/p>\n<p><strong>A29<\/strong> Gunduz, M., and Laitinen H., \u201cConstruction Safety Risk Assessment with Introduced Control Levels&#8221; Journal of Civil Engineering and Management, Volume 24, Issue 1, January 2018, pages 11-18<\/p>\n<p><strong>A28. <\/strong>G\u00fcnd\u00fcz M., and Yahya A., \u201cAnalysis of Project Success Factors in Construction Industry&#8221; Technological and Economic Development of Economy, Volume 24, Issue 1, January 2018, pages 67-80.<\/p>\n<p><strong>A27<\/strong> Gunduz, M., Birgonul T. and Ozdemir, M., \u201cDevelopment of a Safety Performance Index Assessment Tool by Using a Fuzzy Structural Equation Model for Construction Sites\u201d, Automation in Construction, Volume 85, January 2018, pages 124-134<\/p>\n<p><strong>A26<\/strong> Gunduz, M., Naser A.F., \u201cCost Based Value Stream Mapping as A Sustainable Construction Tool for Underground Pipeline Construction Projects&#8221;, Sustainability, Volume 9, Issue 12, December 2017<\/p>\n<p><strong>A25<\/strong> Senouci A., Alsarraj A., Gunduz, M., Eldin N., \u201cAnalysis of Change Orders in Qatari Construction Projects\u201d, International Journal of Construction Management, Volume 17, Issue 4, November 2017, pages 280-292<\/p>\n<p><strong>A24. <\/strong>G\u00fcnd\u00fcz M., and Karacan V., \u201cAssessment of Abnormally Low Tenders: A Multinomial Logistic Regression Approach&#8221;, Technological and Economic Development of Economy, Volume 23, Issue 6, November 2017, pages 848-859 \u00a0<strong>A23<\/strong> Gunduz, M., AbuHassan H.A., \u201cMapping the industrial perception of delay data through importance rating\u201d, Arabian Journal for Science and Engineering, September 2017, 42(9), 3799-3808<strong>\u00a0<\/strong><\/p>\n<p><strong>A22.<\/strong> Gunduz M. and Laitinen, H., \u201cA 10-step Safety Management Framework for Construction SMEs&#8221; International Journal of Occupational Safety and Ergonomics (JOSE), Volume 3, Issue 3, July-September 2017, pages 353-359<\/p>\n<p><strong>A21<\/strong> Gunduz M. and Laitinen, H., \u201cA 10-step Safety Management Framework for Construction SMEs&#8221; accepted to the International Journal of Occupational Safety and Ergonomics (JOSE), February 2016.<\/p>\n<p><strong>A20 <\/strong>G\u00fcnd\u00fcz M., and Yahya A., \u201cAnalysis of Project Success Factors in Construction Industry&#8221; accepted to Technological and Economic Development of Economy, online, Dec 2015. <u><a href=\"http:\/\/dx.doi.org\/10.3846\/20294913.2015.1074129\">http:\/\/dx.doi.org\/10.3846\/20294913.2015.1074129<\/a><\/u><\/p>\n<p><strong>A19 <\/strong>G\u00fcnd\u00fcz M., and Karacan V., \u201cAssessment of Abnormally Low Tenders: A Multinomial Logistic Regression Approach&#8221; accepted to Technological and Economic Development of Economy, online, September2015 <a href=\"http:\/\/dx.doi.org\/10.3846\/20294913.2015.1071294\">http:\/\/dx.doi.org\/10.3846\/20294913.2015.1071294<\/a><\/p>\n<p><strong>A18 <\/strong>G\u00fcnd\u00fcz M., Nielsen, Y. and Ozdemir, M.,\u00a0 \u201cA Fuzzy Assessment Model to Estimate the Probability of Schedule Delay in Construction Projects \u201c, ASCE Journal of Management in Engineering, Volume 31, Issue 4, July 2015.<\/p>\n<p><strong>A17<\/strong> G\u00fcnd\u00fcz M. and Sahin, H.B., \u201cAn Early Cost Estimation Model For Hydroelectric Power Plant Projects Using Neural Networks And Multiple Regression Analysis \u201c, \u00a0Journal of Civil Engineering and Management,\u00a0 Volume 21, Issue 4, pages 470-477, July 2015<\/p>\n<p><strong>A16<\/strong> Aminbakhsh S., G\u00fcnd\u00fcz M. and Sonmez, R.,\u00a0 \u201cSafety Risk Assessment Using Analytic Hierarchy Process (AHP) During Planning and Budgeting of Construction Projects \u201c, Journal of Safety Research, Volume 46, pages 99-105, September 2013.<\/p>\n<p><strong>A15<\/strong> G\u00fclcicek U., Ozkan, O., Gunduz M and Demir, I.H., \u201cCost Assessment Of Construction Projects Through Neural Networks \u201c, Canadian Journal of Civil Engineering, Volume 40, Issue 6, pages 574-579, June 2013.<\/p>\n<p><strong>A14<\/strong> G\u00fcnd\u00fcz M., and Onder, O, \u201cCorruption and Internal Fraud in the Turkish Construction Industry \u201c, Science and Engineering Ethics, Volume 19, Issue 2, pages 505-528, June 2013.<\/p>\n<p><strong>A13<\/strong> G\u00fcnd\u00fcz M., Nielsen, Y. and Ozdemir, M.,\u00a0 \u201cQuantification of Delay Factors by Using Relative Importance Index (RII) Method for Construction Projects in Turkey \u201c, ASCE Journal of Management in Engineering, Volume 29, Issue 2, pages 133-139, April 2013.<\/p>\n<p><strong>A12<\/strong> Ozkan, F., Ozkan O. and Gunduz M. \u201cCausal Relationship between Construction Investment Policy and Economic Growth in Turkey\u201c,Technological Forecasting and Social Change, Volume 79, Issue 2, pages 362-370, February 2012.<\/p>\n<p><strong>A11<\/strong> G\u00fcnd\u00fcz M., Ugur LO ve Ozturk, E., \u201c Parametric Cost Estimation System for Light Rail Transit and Metro Trackworks\u201c, Expert Systems with Applications, Volume 38, Issue 3, pages 2873-2877, March 2011.<\/p>\n<p><strong>A10<\/strong> Kan\u0131t, R., \u00d6zkan \u00d6, ve G\u00fcnd\u00fcz M., \u201c Effects of Project Size and Resource Constraints on Project Duration through Priority Rule-Base Heuristics\u201d, Artificial Intelligence Review, Volume 32, 1-4, pages 115-123 (2009).<\/p>\n<p><strong>A9<\/strong> G\u00fcnd\u00fcz M., ve Karacan V., \u201cDamage to Treasury &#8211; Abnormally Low Tenders in Public Construction Works \u201c ASCE <em>Journal of Legal Affairs and Dispute Resolution in Engineering and Construction<\/em>, Volume 1, Issue 3, Pages 130-136, August 2009<\/p>\n<p><strong>A8<\/strong> Kan\u0131t, R., G\u00fcnd\u00fcz M., ve \u00d6zkan \u00d6, \u201cInvestigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects\u201d, ASCE Journal of Construction Engineering and Management, Volume 135, Issue 7, Pages 609-613, July 2009<\/p>\n<p><strong>A7<\/strong> G\u00fcnd\u00fcz M., ve \u015eim\u015fek B., \u201c A Strategic Safety Management Framework Through Balanced Scorecard and Quality Function Deployment\u201c, Canadian Journal of Civil Engineering, Volume 34, Issue 5, Pages 622-630, 2007.<\/p>\n<p><strong>A6<\/strong> Hanna A.S., ve G\u00fcnd\u00fcz, M. \u201cEarly Warning Signs for Distressed Projects\u201d, Canadian Journal of Civil Engineering, Volume 32, Issue 5, Pages 796-802, 2005.<\/p>\n<p><strong>A5 <\/strong>Kan\u0131t, R., G\u00fcnd\u00fcz M., ve \u00d6zkan \u00d6, \u201cCost Effect of Earthquake Region and Soil Type for Office Buildings in Turkey\u201d, Building and Environment Journal, Volume 42, Issue 10,\u00a0Pages 3616-3620, 2007<\/p>\n<p><strong>A4<\/strong> Kan\u0131t, R., \u00d6zkan \u00d6, ve G\u00fcnd\u00fcz M., \u201cCost Assessment of Concrete and Steel Types for Office Buildings: An Exploratory Study\u201d, Building and Environment Journal,\u00a0Volume 42, Issue 9,\u00a0Pages 3404-3409, 2007<\/p>\n<p><strong>A3<\/strong> G\u00fcnd\u00fcz, M. ve Hanna A.S., \u201cBenchmarking Change Order Impacts on Productivity for Electrical and Mechanical Projects\u201d, Building and Environment Journal, Volume 40, Issue 8, Pages 1068-1075, 2005<\/p>\n<p><strong>A2<\/strong> G\u00fcnd\u00fcz, M., \u201cA Quantitative Approach for Evaluation of Negative Impact of Overmanning on Electrical and Mechanical Projects\u201d, Building and Environment Journal, Volume39, Issue 5, Pages 581-587, 2004<\/p>\n<p><strong>A1<\/strong> Hanna, A. S. ve G\u00fcnd\u00fcz M., \u201cImpact of Change Orders on Small Labor-Intensive Projects\u201d, ASCE Journal of Construction Engineering and Management, Volume 130, Issue 5, Pages 726-733, 2004<\/p>\n<p><strong>INTERNATIONAL CONFERENCES<\/strong><\/p>\n<p><strong>C22.<\/strong> Falamarzi, M.H., Gunduz, M., Naji, K. \u201cA Framework for Selecting Contractors for Last-Minute Mega Events Projects Using Analytical Network Process (ANP) &#8220;, submitted to 12th Annual EDSI Conference, Dublin, Ireland, 29 May &#8211; 01 June 2022<\/p>\n<p><strong>\u00a0<\/strong><strong>C21.<\/strong> Abukeshek, A.K., Gunduz M., Abdalla, G., and Naji, K, \u201cAnalysis of Construction Critical Success Factors (CSF) for Public-Private Partnership (PPP) for Sports Infrastructure in Qatar Using Relative Importance Index\u201d, Proceedings of the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-au-Prince, Haiti, June 15-16, 2021.<\/p>\n<p><strong>\u00a0<\/strong><strong>C20.<\/strong> Gunduz M., and Elsherbeny, H.A., \u201cContribution of Construction Contract Administration Process Groups to Overall Contract Administration Performance\u201d, 2ND International Conference on Engineering And Technology Research 2020 (ICETR 2020), June 26-28, 2020, Kuala Lumpur, Malaysia.<\/p>\n<p><strong>\u00a0<\/strong><strong>C19.<\/strong> Gunduz M., and Elsherbeny, H.A., \u201cPractical Implementation of Contract Administration Performance Model in Qatar Construction Projects\u201d, CIC2020: International Conference on Civil Infrastructure And Construction, February 2-5, 2020, Doha, Qatar.<\/p>\n<p><strong>\u00a0<\/strong><strong>C18.<\/strong> Gunduz M., and Al-Ruwaili, A, \u201cTendering Process Improvement with Prototype Designs Implementation\u201d, ICCSE 2019: Fourth International Conference On Civil And Structural Engineering, June 14-16, 2019, Phuket, Thailand.<\/p>\n<p><strong>\u00a0<\/strong><strong>C17.<\/strong> G\u00fcnd\u00fcz M., and Naser, A.F., \u201cValue Stream Mapping as a Lean Tool for Construction Projects\u201d, ICCEMS 2018: Third International Conference on Civil Engineering and Materials Science, April 13-15, 2018, Chengdu, China.<\/p>\n<p><strong>\u00a0<\/strong><strong>C16.<\/strong> G\u00fcnd\u00fcz M., and Maki, O.L., \u201cCauses of Cost Overrun in Construction Industry\u201d, ICCEMS 2017: Second International Conference on Civil Engineering and Materials Science, May 26-28, 2017, Seoul, South Korea.<\/p>\n<p><strong>\u00a0<\/strong><strong>C15.<\/strong> G\u00fcnd\u00fcz M., and AbuHassan, M.H.A., \u201cCauses of Construction Delays in Qatar Construction Projects\u201d, ICCEAE 2016: 18th International Conference on Civil, Environmental and Architectural Engineering, April 25-26, 2016 Boston, USA.<strong>\u00a0<\/strong><\/p>\n<p><strong>C14.<\/strong> G\u00fcnd\u00fcz M., Birgonul T. and Ozdemir, M., \u201cA Fuzzy Structural Equation Model for Development of a Safety Performance Index\u201d, IIER 19th International Conference on Recent Innovations in Engineering and Technology, October 23, 2015 New York, USA., pp. 26-30<\/p>\n<p><strong>C13. <\/strong>G\u00fcnd\u00fcz M. ve Onder, O. \u201cFraud and Corruption Risk Assessment in Construction Industry\u201d, 2012 RICS COBRA International Research Conference, September 11-13, 2012, Las Vegas, Nevada<\/p>\n<p><strong>C12. <\/strong>G\u00fcnd\u00fcz M. ve Sahin, H.B. \u201cEconomical Analysis of Privatized Hydroelectric Power Plant Projects in Turkey \u201d, 2011 USSD Annual Meeting and Conference, April 11-15, 2011, San Diego, California<\/p>\n<p><strong>C11. <\/strong>G\u00fcnd\u00fcz M. ve Sahin, H.B. \u201cA Conceptual Cost Estimation Model for Hydroelectric Power Plant Projects\u201d, 30<sup>th<\/sup>\u00a0 USSD Annual Meeting and Conference, April 12-16, 2010, Sacramento, California<\/p>\n<p><strong>C10. <\/strong>G\u00fcnd\u00fcz M. ve \u00d6zt\u00fcrk, E. \u201cCost Estimation of Trackworks of Lightrail and Metro Projects\u201d, Fifth International Conference on Construction in the 21<sup>st<\/sup> Century (CITC-V), \u201cCollaboration and Integration in Engineering, Management and Technology\u201d, May 20-22, 2009, Istanbul, Turkey<\/p>\n<p><strong>C9.<\/strong> G\u00fcnd\u00fcz M. ve Karacan, V. \u201cA MULTINOMIAL LOGISTIC REGRESSION MODEL ON ABNORMALLY LOW TENDERS\u201d, CIB TG61 \/ W117 Performance Measurement in Construction 4th Annual Meeting, Tempe, Arizona, USA, February 9, 2009.<\/p>\n<p><strong>C8.<\/strong> G\u00fcnd\u00fcz M. ve Karacan, V. \u201cAbnormally Low Tender Problem In Public Works\u201d, 2008 International Conference on Management Science and Engineering, Long Beach, California, USA, September 10-12, 2008.<\/p>\n<p><strong>C7.<\/strong> G\u00fcnd\u00fcz M. ve Karacan, V. \u201cABNORMALLY LOW TENDERS IN TURKISH CONSTRUCTION INDUSTRY\u201d, The 5th International Conference on Innovation in Architecture, Engineering and Construction, AEC2008, Antalya, Turkey, June 23-25, 2008.<\/p>\n<p><strong>C6.<\/strong> G\u00fcnd\u00fcz M., Ar\u0131kan, M. ve \u015eim\u015fek, B. \u201c Using the QFD Approach as a Safety Management Tool in Dam Engineering\u201d, USSD 27th Annual Meeting and Conference, Pages 671-678, Philadelphia, Pennsylvania, March 5-9, 2007.<\/p>\n<p><strong>C5. <\/strong>G\u00fcnd\u00fcz M. ve Hanna A.S., \u201cEvaluation of Productivity Losses due to Delays,\u201d 4<sup>th<\/sup> International Engineering and Construction Conference, Pages 370-375, California State University, Los Angeles, CA, July 28, 2006.<\/p>\n<p><strong>C4.<\/strong> \u015eahmaran, M., \u00d6zta\u015f A. ve G\u00fcnd\u00fcz M., \u201cA Case Study: Assessment of a Construction Quality Management Program for a Multi-national Project in Turkey,\u201d 4<sup>th<\/sup> International Engineering and Construction Conference, Pages 376-385, California State University, Los Angeles, CA, July 28, 2006.<\/p>\n<p><strong>C3<\/strong>. Jung, S. Y., G\u00fcnd\u00fcz M., \u201cImpact of Overmanning on Construction Labor Productivity for Mechanical and Electrical Contractors\u201d, Proceedings of the 1st International Municipalities University and Industrial Sector Cooperation Symposium, Pages 514-520, Gazi University, Ankara, T\u00fcrkiye, October 23-24,2004.<\/p>\n<p><strong>C2<\/strong>. G\u00fcnd\u00fcz M. ve Hanna, A. S., \u201cIdentification of Over-Budget Project Characteristics Using ANOVA,\u201d Proceedings of the 10<sup>th<\/sup> ISPE International Conference on Concurrent Engineering: Research and Applications,\u00a0 Pages 331-336, Portugal, July 26-30,2003.<\/p>\n<p><strong>C1<\/strong>. Hanna, A. S., Peterson P., Dettwiler J., Russell J.S. ve G\u00fcnd\u00fcz M., \u201cAssessment of Global Impact of Change Orders on Electrical and Mechanical Construction \u2013 D Approach\u201d, Proceedings of the Construction Congress VI, Pages 1177-1188, Orlando, FL, February 20-22, 2000.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>BOOKS<\/strong><\/p>\n<p><strong>D1<\/strong>. G\u00fcnd\u00fcz, M. and \u015eim\u015fek, B. 2009. \u2018Sustainable Construction Safety: A Strategic Framework Through Balanced Score Card and Quality Function Deployment\u2019, VDM Verlag, ISBN: 978-3-639-16200-4<\/p>\n<p><strong>D2<\/strong>. G\u00fcnd\u00fcz, M. and \u00d6zt\u00fcrk, E. 2009. \u2018Predicting Light Rail and Metro Trackworks Costs: A Multivariable Regression and Neural Netwrok Approach\u2019, VDM Verlag, ISBN: 978-3-639-16404-6<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>LOCAL CONFERENCES<\/strong><\/p>\n<p><strong>E1<\/strong>. G\u00fcnd\u00fcz M ve Korkut A.E., \u201cYap\u0131 \u0130\u015flerinde Sa\u011fl\u0131k ve G\u00fcvenlik Y\u00f6netmeli\u011finin daha iyi anla\u015f\u0131lmas\u0131 i\u00e7in Avrupa Birli\u011fi uygulamalar\u0131n\u0131n ara\u015ft\u0131r\u0131lmas\u0131\u201d, 2. Proje ve Yap\u0131m Y\u00f6netimi Kongresi, 13-16 Eyl\u00fcl 2012, \u0130zmir, T\u00fcrkiye<\/p>\n<p><strong>E2<\/strong>. G\u00fcnd\u00fcz M ve Ta\u015fy\u00fcrek Y.E., \u201c Comparative Measures of Accident Rates\u201d, \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Sempozyumu, 13-14 November,2009, TMMOB \u0130n\u015faat M\u00fchendisleri Odas\u0131<\/p>\n<p><strong>E3<\/strong>. G\u00fcnd\u00fcz M ve Ta\u015fy\u00fcrek Y.E., \u201c Construction Industry Safety Performance: Comparative Comparison with Incidence Rates\u201d, \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Sempozyumu, 13-14 November,2009, TMMOB \u0130n\u015faat M\u00fchendisleri Odas\u0131<\/p>\n<p><strong>E4<\/strong>. G\u00fcnd\u00fcz M ve Ta\u015fy\u00fcrek Y.E., \u201c How Severe are Construction Accidents in Turkey?\u201d, \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Sempozyumu, 13-14 November,2009, TMMOB \u0130n\u015faat M\u00fchendisleri Odas\u0131<\/p>\n<p><strong>E5<\/strong>. G\u00fcnd\u00fcz M ve Ta\u015fy\u00fcrek Y.E., \u201c Distribution of Occupational Accidents in the Construction Industry According to Various Variables\u201d, \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Sempozyumu, 13-14 November,2009, TMMOB \u0130n\u015faat M\u00fchendisleri Odas\u0131<\/p>\n<p><strong>E6<\/strong>. G\u00fcnd\u00fcz M ve Ta\u015fy\u00fcrek Y.E., \u201c Frequency Severity Indicators of Turkish Provinces According to Construction Safety Performances\u201d, \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Sempozyumu, 13-14 November,2009, TMMOB \u0130n\u015faat M\u00fchendisleri Odas\u0131<\/p>\n<p><strong>E7<\/strong>. Manisal\u0131, E., Kan\u0131t, R., G\u00fcnd\u00fcz, M., Ta\u015fy\u00fcrek, E., Tarhan, \u00dc., \u201c \u0130n\u015faat Sekt\u00f6r\u00fcnde \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Durumunun De\u011ferlendirilmesi \u201d, \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Sempozyumu, Sayfa 183-192, TMMOB \u0130n\u015faat M\u00fchendisleri Odas\u0131, Ankara, 5-6 Ekim 2007.<\/p>\n<p><strong>E8<\/strong>. G\u00fcnd\u00fcz, M. ve \u00c7ubuk\u00e7u S., \u201cDeprem Sonras\u0131 Zarar G\u00f6rm\u00fc\u015f Binalar\u0131n G\u00fc\u00e7lendirme Tekniklerinin Ekonomik A\u00e7\u0131dan Kar\u015f\u0131la\u015ft\u0131r\u0131lmas\u0131\u201d, Yap\u0131 ve Kentte Bili\u015fim IV. Kongresi, Ankara HiltonSA, Sayfa 125-128, Haziran 8-9, 2006.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>F1.<\/strong> Vahapassi A., Laitinen T., G\u00fcnd\u00fcz M., ve Y\u0131ld\u0131r\u0131m, T., \u201cImprovement of Occupational Health and Safety Conditions at Construction Workplaces in Turkey\u201d, The XIX World Congress on Safety and Health at Work, Invited Speaker, Hali\u00e7 Kongre Merkezi, \u0130stanbul, 11-15 Eyl\u00fcl, 2011.<\/p>\n<p><strong>F2.<\/strong> G\u00fcnd\u00fcz M., ve \u015eim\u015fek, B., \u201c B\u00fcy\u00fck M\u00fchendislik Yap\u0131lar\u0131 Y\u00f6n\u00fcnden Kalite Fonksiyon A\u00e7\u0131l\u0131m\u0131 Yakla\u015f\u0131m\u0131n\u0131n \u0130\u015f Sa\u011fl\u0131\u011f\u0131 ve G\u00fcvenli\u011fi Konusunda Uygulanmas\u0131\u201d, Baraj ve Deprem Semineri, Invited Speaker, Osmangazi \u00dcniversitesi, Eski\u015fehir, 11-12 May\u0131s, 2006.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>REFEREED PAPERS A64. Gunduz, M., Abumoza, A.M., Aly, A. Aly \u201cA Structural Equation Model to Assess the Effects of Strategic [&hellip;]<\/p>\n","protected":false},"author":472,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-6","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/pages\/6","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/users\/472"}],"replies":[{"embeddable":true,"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/comments?post=6"}],"version-history":[{"count":7,"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/pages\/6\/revisions"}],"predecessor-version":[{"id":67,"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/pages\/6\/revisions\/67"}],"wp:attachment":[{"href":"http:\/\/qufaculty.qu.edu.qa\/mgunduz\/wp-json\/wp\/v2\/media?parent=6"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}